Seasonal Inspection of Solvent Recovery Units: Insulation and Refrigerant System Service Before Winter

Release time: October 19, 2026 08:21:04 popularity:

Seasonal inspection is the most easily skipped and accident-prone part of the solvent recovery unit throughout the year. Before winter, check the heat preservation, refrigerant, drainage and instrument, which is much more convenient than freezing and blocking roads at low temperature in winter and stopping the instrument for emergency repair. This paper combs the key projects and service arrangements according to the inspection order.

Why must we change the season before winter

The influence of low temperature on the device is in series: the pipe section with damaged insulation is first condensed and frosted, the liquid accumulation at the drainage point freezes to block the road, the condensation temperature deviates from the design range, and the recovery rate drops. The instrument connecting pipe freezes and cracks, the pressure pipe accumulates water and freezes, and the display is distorted or even stops. These problems broke out one by one after the winter, and the repair window coincided with the peak production season, which cost much more than a systematic inspection.

Which items are checked in different seasons

The inspection shall be carried out in the order of "first heat preservation, then refrigerant, then liquid discharge and final instrument". See the following table for key items:

Inspection itemInspection methodProcessing direction
Insulation of pipeline and equipmentVisually check the weak section with infrared temperature measurementRepair the damaged insulation layer
Refrigerant systemCheck refrigerant storage, pressure and heat exchange surfaceSupplement refrigerant and clean heat exchange surface
Low Point DrainPoint-by-point test run to confirm patencyDredge and do antifreeze tracing
Instrument and Pressure PipeCheck the accumulated water, heat preservation and indication valueDrainage, insulation or replacement

How to close the loop of the problems found in the inspection

Seasonal Inspection of Solvent Recovery Units: Insulation and Refrigerant System Service Before Winter

On-site inspection is recorded item by item, and problems are classified according to the three levels of "immediate treatment, deadline treatment and inclusion in the maintenance plan": heat preservation supplement, drainage and dredging, which can be handled on the spot on duty; Heat exchange surface cleaning, heat tracing and installation, etc. that require shutdown or spare parts are included in the deadline; Items involving overhaul are included in the annual maintenance plan to form a closed-loop ledger.

How to arrange and deliver services

LuoyangWohong PetrochemicalEquipment Co., Ltd. provides seasonal inspection service for solvent recovery devices: on-site inspection before winter, inspection list according to device model, inspection records and rectification suggestions after on-site inspection, items that can be handled on duty are handled on the spot, and problem items are filed after closed-loop re-inspection. The inspection records are synchronized as the reference for winter operation parameters, which is convenient to check the recovery effect week by week during the heating period.

What to pay attention to in winter operation

  1. Check the condensation temperature and recovery effect every week, and compare with the benchmark of seasonal inspection;
  2. During the low temperature period, the liquid discharge point shall be encrypted and inspected. If the liquid discharge slows down, check whether it is frozen first;
  3. Pay attention to the frosting trend of heat exchange surface, arrange defrosting in time, and run without hard top;
  4. Regularly recheck the insulation of outdoor instrument and pressure pipe, and make another inspection after strong wind cooling;
  5. Abnormal records are filed one by one to accumulate control data for seasonal inspection in the coming year.

FAQ

What time is the seasonal inspection usually arranged?

It is suggested that the rectification window should be reserved before the temperature drops steadily to the low temperature section. The northern region should plan ahead to avoid the rush repair peak brought by the first cold wave.

How to cooperate with enterprise self-inspection and entrusted service?

Daily thermal insulation and drainage inspection can be completed by the enterprise self-inspection; Refrigerant system, instrument calibration and other items that need professional testing are recommended to be entrusted to the service party, and the results of the two parties are summarized into a ledger with the same caliber for easy comparison.

Do the problems found in the inspection have to be rectified in that year?

Issues involving insulation deficiencies and the risk of liquid drainage freezing should be addressed before winter; otherwise, the likelihood of failures during cold periods will be high. Items that do not affect winter operations may be included in the annual plan, but must have clearly defined responsibilities and deadlines.

What is the purpose of inspection records?

It serves as the benchmark for winter operating parameters and also marks the starting point for the seasonal inspection conducted the following year. Over time, the accumulated data can reveal trends in the equipment’s condition, enabling proactive maintenance planning.

This article was compiled by Luoyang Wohong Petrochemical Equipment Co., Ltd. The company provides services such as seasonal inspections of solvent recovery units and winter operation and maintenance support. We welcome your inquiries and discussions.

National Service Network

NATIONAL SERVICE NETWORK 31 Provinces and Municipalities - Local Service
Online Service
Hotline

Hotline

13526990215

WeChat
Luoyang Wohong Petrochemical Equipment Co., Ltd.
Back to Top