Service Hotline:

13526990215

Luoyang Wohong Petrochemical Equipment Co., Ltd.

Skid-mounted VOC waste gas treatment equipment, quick installation does not occupy the site

Release date: 2026-07-13 10:59:41 popularity:

The installation of traditional VOCs processing equipment often takes a long time, with on-site construction, pipeline welding and instrument debugging ranging from weeks to months, and the delay in construction period affects normal production. Wohong skid-mounted VOCs processing equipment has changed this situation.

The Wo Hong equipment adopts a skid-mounted design. The compressor, condenser, membrane module, and control system are all integrated on a steel base, and all assembly and debugging are completed before leaving the factory. Once the equipment arrives on site, it can be put into operation simply by connecting the power supply and air lines. The installation period is measured in days and typically completed within two days.

Another advantage of the skid-mounted structure is its small footprint. Taking the compressed condensing membrane separation unit with a processing air volume of 100 cubic meters/hour as an example, the minimum equipment size can be 5.0 meters × 2.5 meters, covering an area of about 12.5 square meters, and the smaller unit can be controlled within 10 square meters. Compared toRTOThe equipment covers an area of hundreds of square meters, and the skid-mounted equipment can be placed in the open air without the need to build a separate equipment plant, which is especially suitable for renovation projects with limited space.

The equipment is based on the "compression condensation membrane separation" combined process as the core, does not involve combustion, no open flame, and has good applicability in explosion-proof places. Driven by electricity, no.activated charcoalWait for consumables to be replaced; no hazardous waste is generated. If the equipment needs to be relocated in the later period, it can be hoisted as a whole and can be reused.

Before selecting equipment, it is recommended to first conduct a process condition assessment and match the equipment specifications based on concentration, composition, and airflow rate.Wohong PetrochemicalThe design and manufacturing services of skid-mounted equipment can be provided according to the customer's working condition parameters.


National Service Network

NATIONAL SERVICE NETWORK 31 Provinces and Municipalities - Local Service
Online Service
Hotline

Hotline

13526990215

WeChat
Luoyang Wohong Petrochemical Equipment Co., Ltd.
Back to Top