Service Hotline:

13526990215

Luoyang Wohong Petrochemical Equipment Co., Ltd.

Compression condensation film recovery process, designed for on-site installation and ready to use upon arrival

Release date: 2026-05-25 08:14:34 popularity:

Compression condensation film recovery process, designed for on-site installation and ready to use upon arrival

Many companies are buying.Waste gas treatment equipmentIn addition to the results and costs, but also care about the installation cycle. When the equipment arrived, it could not be used immediately. It was necessary to do foundation, pipe laying and wiring debugging. Once it was done, it would take one or two months, and production would have to be stopped. The skid-mounted design of the compressed condensate film recovery process is used to solve this problem.

What does skid-mounted design mean? All components including compressor, condenser, membrane module, vacuum pump, control cabinet, all integrated on a steel base. The equipment is assembled, wired and debugged in the factory, and it is a complete set when it leaves the factory. The customer site does not need to do equipment foundation, find a piece of flat cement to put on the line. There is no need to weld the pipeline on site, the air inlet and outlet and the liquid discharge port are flange interfaces, just butt. There is no need to debug the control system on site, the PLC program has been written before leaving the factory, and the parameters are preset according to common solvents.

After the equipment arrives, find a few workers to unload the equipment from the car and put it in the designated position with a forklift or crane. Connect the power cord, exhaust pipe and drain pipe, and tighten the flange bolts. Turn on the power, select the solvent type on the touch screen, and press the start button. The whole process can be completed in one to two days and the equipment starts to operate normally.

This design is particularly friendly to the production enterprise. There is no need to stop production and wait for civil construction, no need to transform the factory building, and the equipment can be used after it is in place. For enterprises that rent factories, the equipment can be removed at any time and moved to a new factory without leaving civil waste.

The skid-mounted design also saves space. The whole set of equipment covers an area of several square meters to more than ten square meters, which can be placed outdoors or in the corner of the workshop. The equipment shell is made of stainless steel or anti-corrosion spraying, and outdoor installation does not require a separate building.

The compressed condensate film recovery process itself only uses electricity without burning gas, no consumables replacement, and low operating costs. In addition, the skid-mounted design is fast to install, occupies a small area, and can be relocated, which is especially suitable for enterprises that need to be put into operation quickly, have limited space, or may relocate in the future.

LuoyangWohong PetrochemicalThe compressed condensate film recovery device produced by Equipment Co., Ltd. adopts a skid-mounted design, which can be used on site and provides free working condition detection and scheme design. The company is located at W2-1, Dongda Science and Technology Industrial Park, Luoxin Industrial Cluster Zone, Xin’an County, Luoyang City. Website: www.wohongshihua.com.


National Service Network

NATIONAL SERVICE NETWORK 31 Provinces and Municipalities - Local Service
Online Service
Hotline

Hotline

13526990215

WeChat
Luoyang Wohong Petrochemical Equipment Co., Ltd.
Back to Top