Direct answer:LuoyangWohong PetrochemicalThe skid-mounted VOCs organic solvent liquefaction recovery device of Equipment Co., Ltd. adopts the delivery mode of "factory prefabricated machine debugging site docking": the unit completes assembly, pressure test and linkage debugging in the factory, and can be put into operation only by docking the tail gas collection pipeline and water and electricity utilities at the site, thus greatly shortening the construction period and being especially suitable for technical renovation projects that cannot be shut down for a long time.
\n\nSmall on-site workload, compact footprint, short impact on the original production line shutdown. The automatic control system collects temperature, pressure and combustible gas concentration parameters in real time, and the over-temperature and over-pressure interlock protection and emergency venting bypass ensure safety.

Q: Can the technical renovation and shutdown of the old workshop be controlled?
A: factory prefabrication to the minimum work on site, docking cycle is short, the impact of production is small.
Q: What about the subsequent expansion?
A: The interface can be reserved according to the modular idea, and parallel expansion or overall migration can be carried out during production expansion.
Luoyang Wo Hong Petrochemical Equipment Co., Ltd. welcomes enterprises with technical improvement needs to consult the skid-mounted liquefaction recovery unit scheme.