Factory Prefabrication and Field Delivery Process of Skid-mounted VOCs Solvent Recovery Unit

Release date: 2026-09-12 08:22:58 popularity:

LuoyangWohong PetrochemicalThe skid-mounted VOCs solvent liquefaction recovery device of Equipment Co., Ltd. adopts factory prefabrication and overall delivery mode: the equipment completes integrated assembly and factory inspection in the factory, and only needs to connect pipelines, power supply and discharge ports on site, thus greatly reducing the on-site construction period and reducing interference to customer production.

Why 1. Choose Skid-mounted Prefabrication

The traditional on-site production mode is greatly affected by the site, weather and cross operation, and the quality consistency is difficult to guarantee. Skid-mounted prefabrication integrates condensing units, membrane separation components, pipeline valves and control systems into one or more skids in the factory. Pressure test and joint adjustment are completed before leaving the factory, and the site becomes three steps of "putting in place, connecting pipelines and electrifying and debugging.

Delivery of Skid-mounted VOCs Solvent Recovery Unit

2. Delivery Process

PhaseJob responsibilities
Plan confirmationDetermine configuration and layout after working condition survey
Factory prefabricationSkid integration, pressure test and delivery inspection
Transport in placeThe whole is transported to the site and hoisted in place.
On-site accessButt collection pipe, power supply, drain
Commissioning DeliveryJoint commissioning, operation training and data handover

3. after-sales guarantee

After the handover of the device, it enters the quality assurance and operation and maintenance phase: regular inspection, replacement of wearing parts, membrane module performance testing, remote operation consultation, etc. are included in the scope of services. Wo Hong establishes customer files, tracks device operation data, and responds with abnormal priority.

4. FAQ

Q: What are the requirements of the skid-mounted device for the site?
Answer: The foundation is flat and there is room for maintenance and operation. The specific conditions shall be confirmed by technicians on site at the scheme stage.

Q: Does on-site access need to be discontinued?
Answer: The pipeline access should be arranged in the batch gap or maintenance window as far as possible. Most projects can realize short window access.

Q: Do operators need training?
Answer: The commissioning and delivery phase includes operation training and provides operation manual. The daily operation is not complicated.

Luoyang Wo Hong Petrochemical Equipment Co., Ltd., VOCs solvent liquefaction recovery device professional manufacturer.

National Service Network

NATIONAL SERVICE NETWORK 31 Provinces and Municipalities - Local Service
Online Service
Hotline

Hotline

13526990215

WeChat
Luoyang Wohong Petrochemical Equipment Co., Ltd.
Back to Top