Skid-mounted VOCWaste gas treatment equipment, it will be put into operation in two days
The installation process of traditional VOCs processing equipment is often a time-consuming project. On-site construction, pipeline welding, instrument debugging, less than a few weeks, more than a few months. After the equipment enters the site, the foundation construction and pipeline connection alone can make the production line wait for more than half a month. The longer the construction period, the greater the impact on the normal operation of the plant.
Wo Hong's skid-mounted design completely simplifies this problem.
The compressor, condenser, membrane module and control system are all integrated on a steel base. Complete all assembly and commissioning before the factory, shipped to the site is a complete equipment. The crane is in place, connected to the power supply and gas circuit, and can be put into operation within two days.
There is no need to do equipment foundation, pipeline welding and instrument debugging on site. Equipment to the scene, unloading in place, connected to electricity and gas can be used. The duration is no longer the bottleneck restricting the progress of the project.
The execution logic is equally straightforward. The exhaust gas is pressurized by the compressor and then enters the condensing unit to cool down. Most of the organic matter changes directly from gaseous to liquid in the condensation section and flows out of the collection tank at the bottom of the equipment. The uncondensed tail gas enters the membrane module, and the organic matter preferentially permeates through the difference between the permeation rate of organic matter and air in the membrane material, forming concentrated gas and sending it back to the front end for circulation treatment, and the air is discharged up to the standard.
This process solves two things at the same time: one is that the emission concentration meets the environmental protection requirements, and the other is to turn the solvent in the exhaust gas into a liquid for reuse.
The equipment is driven by electricity, does not burn gas, and has noactivated charcoalConsumables do not generate hazardous waste. PLC automatic control, no special duty.
For the waste gas with medium and high concentration and recovery value, Wohong skid-mounted condensing membrane separation equipment is the choice of quick operation and quick effect. According to the exhaust gas parameters to match the equipment specifications, first do the working condition detection, take the data to speak. The equipment will be put into operation in two days, and the waste gas will become solvent.