Guidelines for Environmental Protection Renovation of Gas Stations: Key Points and Frequently Asked Questions for Installation of Three stage Oil and Gas Recovery Equipment

Release time: August 23, 2026 11:24:17 popularity:

More and more gas stations are putting the installation of triple oil and gas recovery equipment on the agenda. After the equipment selection is completed, scientific and standardized installation and debugging are the key links to ensure the long-term stable operation of the system. This article combines engineering practice to summarize the practical points of installation and maintenance of oil and gas recovery equipment.

1、 Preparation work before installation

Before installation, a site survey should be completed to confirm the number and volume of oil tanks, the direction of breathing pipelines, and electrical conditions. The installation location of the equipment should meet the requirements of fire separation distance, facilitate daily maintenance and repair, and avoid direct sunlight and rainwater immersion.

It is recommended to confirm the basic drawings and interface list with the equipment supplier in advance, and prepare the pipeline connectors, explosion-proof cables, and grounding facilities. Electrical construction in explosion-proof areas must be carried out by qualified professionals.

2、 Key points of pipeline connection and electrical construction

The gas collection pipeline of the oil and gas recovery system should be as short and straight as possible to reduce bends and resistance losses, ensuring smooth entry of oil and gas into the processing unit. After the pipeline connection is completed, a tightness test is required to ensure no leakage.

The electrical components, including power supply connections, sensor signal lines, and control cabinet wiring, must be constructed in accordance with explosion-proof standards. The control cabinet should be installed in non hazardous areas or use explosion-proof cabinets, and the grounding resistance must meet relevant safety requirements.

3、 Debugging and acceptance steps

After the system installation is completed, no-load debugging should be carried out first to check whether the equipment operation direction, sensor signals, and control system logic are correct. Subsequently, a load test run was conducted to observe the start stop response of the system under different oil tank pressures.

During acceptance, the focus should be on verifying the processing efficiency, recovery effect, and emission indicators, and signing the acceptance record after confirming that they have reached the design values. It is recommended to provide operational training to the maintenance personnel of the gas station simultaneously to ensure standardized daily use.

4、 Common problems and daily maintenance

Common problems during operation include frequent system start stop, decreased processing efficiency, and abnormal alarm prompts. In most cases, it can be resolved by checking for clogged filter cartridges, sensor drift, and pipeline sealing. Suggest establishing a regular inspection system to check the operational status of key components on a monthly basis.

activated charcoalThe adsorption unit needs to replace the adsorption medium according to its usage cycle, and the membrane module determines the maintenance timing based on changes in pressure difference. Choosing a supplier that provides remote diagnosis and spare parts support can significantly reduce downtime due to malfunctions.

Standardized installation and maintenance are the guarantee for the long-term value of oil and gas recovery systems. If you have installation planning or technical consulting needs, please feel free to contact our professional team for support.

National Service Network

NATIONAL SERVICE NETWORK 31 Provinces and Municipalities - Local Service
Online Service
Hotline

Hotline

13526990215

WeChat
Luoyang Wohong Petrochemical Equipment Co., Ltd.
Back to Top