VOCWaste gas treatment equipmentInstallation Condition Description | What basic conditions are required on site
Install VOCwaste gas treatmentBefore installing the equipment, it is necessary to have certain basic conditions on site. Preparing these conditions in advance can avoid the embarrassment of equipment being unable to be installed after arrival, and can also shorten the installation and debugging cycle.
The site conditions are the first consideration. The equipment needs to be placed on a flat and sturdy ground, with a load-bearing capacity of no less than two tons per square meter. A maintenance channel of at least one meter should be reserved around the equipment to facilitate daily maintenance and troubleshooting. A 1.5 meter operating space needs to be reserved in front of the control cabinet. The equipment should be avoided from being installed in areas with strong vibrations, and should not be placed in places with direct sunlight or strong heat source radiation.
Power supply conditions are the foundation for equipment operation. Small membrane condensation equipment typically uses 220V single-phase electricity with a power range of 1500 to 2500 watts, which can be supplied by a regular socket. Medium sized and above equipment requires 380 volts of three-phase electricity, with power ranging from several kilowatts to several tens of kilowatts. It is necessary to confirm in advance whether there are sufficient capacity power access points on site, and equip them with corresponding circuit breakers and protective devices.
The cooling water conditions depend on the type of equipment. Air cooled equipment only requires good ventilation and heat dissipation conditions, and does not require external cooling water. Water cooled equipment requires circulating cooling water, with inlet water temperature generally required to be below 30 degrees Celsius, water pressure ranging from 0.2 to 0.4 megapascals, and flow rate determined according to equipment specifications. It is recommended to confirm in advance whether there is cooling water supply on site or whether a cooling tower needs to be configured.
The connection conditions for exhaust gas pipelines need to be prepared in advance. The diameter and position of the inlet and outlet of the equipment should be confirmed before the equipment arrives, and corresponding pipeline interfaces should be reserved on site. The material of the pipeline should match the composition of the exhaust gas. Galvanized or stainless steel ducts can be used for ordinary organic exhaust gas, while stainless steel or plastic ducts should be used for exhaust gas containing corrosive components. The pipeline direction should be as straight as possible, with fewer bends to reduce wind resistance.
The safety conditions cannot be ignored. Fire extinguishing equipment should be equipped in the equipment installation area, and it is recommended to use carbon dioxide or dry powder fire extinguishers. For equipment used to treat flammable exhaust gases, combustible gas detection alarms should be installed on site. The equipment casing and piping system need to be reliably grounded to prevent static electricity accumulation. For explosion-proof equipment, the site should comply with the electrical installation specifications of the explosion-proof area.
LuoyangWohong PetrochemicalThe equipment limited company will provide detailed installation condition instructions before equipment delivery, and can arrange technical personnel to conduct on-site inspections to confirm whether the on-site conditions meet the requirements, in order to avoid discovering problems only after the equipment arrives.