Wo Hong Petrochemical Solvent Recovery Unit Upgrading Service: Evaluation and Updating Path of Old Unit

Release date: 2026-09-18 08:55:14 popularity:

The solvent recovery devices in many enterprise workshops have been in operation for a long time: the type selected according to the process and gas volume at that time, now the process has changed, the gas source has changed, and the emission requirements have also changed. Whether the device can continue to be used, whether it should be modified, and to what extent, a clear evaluation conclusion is needed. LuoyangWohong PetrochemicalEquipment Co., Ltd. provides evaluation and renovation and upgrading services for solvent recovery units. Starting from on-site verification, the current situation, short board and renovation boundary of the units are listed item by item, and then the renewal path is given.

How many items does the assessment start?

The assessment does not simply look at the old and new equipment, but at the gap between its current capabilities and actual needs. The verification contents include four categories: first, the actual processing capacity of the device, which is checked with the current gas concentration; Second, the status of key components, heat exchange surfaces, seals and control systems are checked item by item. The third is to collect the integrity of the system and see which exhaust points are not connected. Fourth, the standard on the discharge side is judged according to the measured outlet concentration.

Status verification steps

  1. Site investigation: record the device model, commissioning time, previous maintenance records and current operating parameters;
  2. Capacity checking: use the current actual gas volume and concentration to calculate the load of the device and judge whether there is margin;
  3. Component inspection: determine the scaling of heat exchange surface, aging of seals, and the status of instruments and control elements item by item;
  4. Collection and investigation: sort out the exhaust points in the workshop and find out the scattered exhaust points that are not connected to the system;
  5. Output conclusion: The three parts that can benefit the old, need to be replaced and need to be added are listed separately as the basis for transformation.

How to choose the transformation path

The evaluation conclusion usually falls on one of the three paths: if the main body of the device is in good condition but only the local capacity is insufficient, local expansion or component replacement is sufficient; If the main body is still there but the process is obviously not matched, supplement and upgrade the process links, such as adding membrane separation or adsorption unit on the basis of the original condensation; If the device is old, has many hidden dangers and is not economical to transform, consider the replacement of the whole machine or skid. The three paths are judged on the basis of the ratio of the transformation input to the expected effect, and the evaluation report will give a comparative conclusion for decision-making.

Wo Hong Petrochemical Solvent Recovery Unit Upgrading Service: Evaluation and Updating Path of Old Unit

Comparison of three transformation paths

How to judge whether the device is modified or replaced?

Compare the transformation input with the replacement input, and consider the remaining service life and the degree of hidden danger. The evaluation report will list the input, effect and implementation difficulty of the two schemes together for decision-making.

Do you want to stop production during the renovation?

Most of the renovation can be carried out in combination with the maintenance window or in batches. The prefabrication work in the factory is completed first, and the on-site connection is mainly taken over. The shutdown time is as short as possible.

Can pipelines from old installations still be used?

To check paragraph by paragraph. The intact pipe section and valve can be incorporated into the new scheme to continue to use, rust or do not meet the current requirements of the paragraph item by item replacement reasons.

Implementation arrangements and delivery

The implementation of the renovation shall be combined with the workshop maintenance window as far as possible. The prefabricated work in the factory shall be completed in advance, and the site shall be mainly connected with takeover, wiring and debugging. Deliverable contents include renovation plan, construction records, commissioning data and operation and maintenance documents, and simultaneous training of post personnel during commissioning. After the transformation is completed, it is suggested to make a one-time return visit to check whether the transformation goal is achieved with the actual operation data.

This article is organized by Luoyang wohong petrochemical equipment co., ltd. the company provides design, manufacturing and operation and maintenance services for condensation recovery, membrane separation recovery and complete solvent recovery units for chemical and pharmaceutical enterprises. if you need process evaluation or scheme configuration, please contact and exchange.

National Service Network

NATIONAL SERVICE NETWORK 31 Provinces and Municipalities - Local Service
Online Service
Hotline

Hotline

13526990215

WeChat
Luoyang Wohong Petrochemical Equipment Co., Ltd.
Back to Top