On-site Installation and Commissioning Service of Solvent Recovery System

Release date: 2026-09-19 08:12:51 popularity:

The effect of solvent recovery system, half by design, half by on-site installation and commissioning. With the same configuration, the takeover mode, slope direction, sealing treatment and control parameter setting are slightly different, and the recovery amount and stability after commissioning can be slightly different. The problem to be solved by on-site service is to accurately drop the intention on the drawing to the site and adjust the parameters to match the actual air source during the debugging phase, instead of installing the equipment and leaving.

Pre-conditions before installation

Before entering the site, several things should be confirmed: whether the bearing and drainage of the foundation and the ground are in place, whether there is operation and maintenance space after the equipment is in place, whether the power supply capacity and grounding are satisfied, and whether the contact position and pipe diameter of the collection pipe network are consistent with the site. One of these items did not meet the requirements of the drawings and will be reworked after entering the site, which will not only delay the construction period but also affect the quality.

Pre-condition checklist

  1. Check the size and levelness of foundation with the position of embedded parts, and confirm the bearing and vibration reduction measures;
  2. Reserve maintenance and hoisting space around the equipment, and specify ventilation conditions;
  3. Confirm power capacity, grounding mode and control cabinet position;
  4. Collect pipe network contacts, pipe diameter and slope direction, and confirm the low point drainage position;
  5. Confirmation of site operation conditions, including hoisting channels and safety measures.

Main contents of installation and commissioning

The installation process focuses on pipeline docking, electrical wiring and sealing treatment. The slope direction and low point drainage of the pipeline shall be implemented according to the design to avoid condensate accumulation. The debugging process is divided into two steps: no-load and on-load: no-load check whether the equipment operation, interlocking and alarm are normal; After loading, adjust the condensation temperature, circulating gas volume and operation mode according to the actual air source, so that the system can operate stably under real working conditions.

On-site Installation and Commissioning Service of Solvent Recovery System

Debugging steps

  1. No-load test run, check equipment steering, pressure and temperature instrument display;
  2. Interlock and alarm function shall be verified item by item to confirm that the protection action is reliable;
  3. Operate with load, adjust the condensing temperature and operating parameters according to the actual air source;
  4. Record the recovery amount and outlet concentration, and check whether it meets the expectation;
  5. The post personnel shall be trained simultaneously, and the inspection items and record requirements shall be specified.

Comparison between Self-installation and Self-adjustment and Professional Installation and Debugging

Comparison itemSelf-installed on siteSupporting professional installation and commissioning
Pipe butt jointConstruction according to experience, easy to ignore the slopeImplement slope direction and low point drainage as per design
Parameter tuningRun by defaultSet and record as per actual air source
Interlock verificationOften omitted.Verify protection action item by item
Delivery DataScattered recordsComplete installation and commissioning data and operation documents

Delivery and Acceptance

The deliverables include installation records, commissioning data, operation and maintenance documentation, and job training. In the acceptance process, it is suggested to check the design objectives with actual operation data, such as recovery amount, export concentration and operation stability, and compare the debugging data with the design value together, and the achievement situation is well documented. After putting into operation, arrange a return visit, review the effect with the operation data, and close the remaining problems.

Frequently Asked Questions

How long does it usually take to install and debug?

Depending on the system scale and site conditions, the site installation and commissioning of a single skid-mounted device can usually be completed within a short period of time, and the specific schedule shall be determined in combination with the site operating conditions.

What does the workshop need to cooperate with during the commissioning phase?

It is necessary to provide the actual gas source working condition and operation period to facilitate the on-load commissioning to set the parameters according to the real conditions; at the same time, arrange the post personnel to participate in the training and recording.

What if the effect does not reach expectations after putting into operation?

First, check which ring the deviation occurs with the operating data, and then check step by step according to the collection, condensation and membrane sections. The installation or parameter adjustment can be solved.

This article by LuoyangWohong PetrochemicalEquipment Co., Ltd. arranges that the company provides design, manufacturing and operation and maintenance services for condensation recovery, membrane separation recovery and complete solvent recovery devices for chemical and pharmaceutical enterprises. If you need process evaluation or scheme configuration, please contact and exchange.

National Service Network

NATIONAL SERVICE NETWORK 31 Provinces and Municipalities - Local Service
Online Service
Hotline

Hotline

13526990215

WeChat
Luoyang Wohong Petrochemical Equipment Co., Ltd.
Back to Top