Luoyang Wo Hong Petrochemical Equipment: Introduction of Technical Transformation and Expansion of Solvent Recovery Unit

Release date: 2026-09-22 08:08:20 popularity:

After the device has been used for several years, it is often difficult for the original recovery device to meet the situation that the original capacity is not enough or does not match the new working conditions: the output is increased, the solvent type is changed, and the emission requirements are increased. At this time, whether to build a new one or transform it on the original basis needs to be clear about the current situation before it is decided. LuoyangWohong PetrochemicalThe equipment provides supporting services for the technical transformation and expansion of the solvent recovery unit, forming a complete path from the status quo verification to the implementation of the scheme.

What circumstances need to consider the transformation or expansion

There are several types of common situations. First, after the output is increased, the exhaust volume is obviously increased, the device cannot handle it, and the recovery rate is decreased. Second, the product structure is adjusted, the exhaust gas composition is changed, and the original temperature level is inappropriate. Third, the emission or reuse requirements are increased, and the original device configuration cannot be reached. Fourth, the equipment is aging, the heat exchange surface is fouled, and the refrigeration capacity is attenuated. It is difficult to restore to the design level by maintenance.

These types of situations correspond to different treatments. The first two categories can be solved through parameter adjustment or local modification, the third category usually needs to add a check at the end, and the fourth category is more involved in expansion.

What few things should be found out in the preliminary inspection?

The renovation is more "symptomatic" than the new construction, and the plan will not go astray if the verification is done carefully. The verification focuses on the actual capability boundaries of existing installations, not just nameplate parameters.

Verification ItemsProblems to be clarifiedThe significance of the transformation
Actual exhaust conditionThe true range of gas volume, concentration, temperature and humidityDetermine post-retrofit treatment capacity targets
Existing capacityHeat exchange area, cooling capacity, allowance of fan and pumpDetermine which paragraph is the real bottleneck
Structure and SiteMain structure, foundation, pipeline and site allowanceDecide if you can retrofit in situ
operation logRecycling trend and historical failureFind out the reason for the ability to decay
Reuse RequirementsRequirements for purity and water content of recovered liquidDecide whether the rear paragraph needs to be supplemented
Emission requirementsCurrent concentration and total control requirementsDecide whether it is necessary to add a check section at the end.

Common directions for transformation

According to the verification conclusion, the transformation direction is roughly divided into four types: adjusting parameters and operation mode; Adding a level of treatment in the middle of the existing process; Replacing or adding a certain section of equipment; Overall expansion or building another set. The first two types of inputs are small, quick, and suitable for situations where the deviation of capacity and working conditions is not large; the latter two types of inputs are large and suitable for occasions where the deviation is obvious.

Luoyang Wo Hong Petrochemical Equipment: Introduction of Technical Transformation and Expansion of Solvent Recovery Unit

Implementation steps

  1. Communicate the needs, clarify the transformation objectives and expected results, and form a preliminary intention.
  2. On-site verification and testing to clarify the current situation, capability boundary and deviation of the device.
  3. Proposed options and selection recommendations, listing alternative routes, input scale and arrangements during implementation.
  4. Confirm the scheme and implementation window, and determine the construction time in combination with the production rhythm of the enterprise.
  5. Equipment manufacturing and mobilization construction shall be carried out step by step according to the plan to minimize the shutdown time.
  6. Commissioning and effect review, item by item verification and sorting operation records according to the transformation objectives.

The trade-off between renovation and new construction

The core of the trade-off is "how much usable value is left in the existing equipment". If the main structure, foundation and site are still usable, the renovation is usually more time-saving and investment-saving than the new construction. If the original design deviates too much and the site is limited, the new construction will be clearer.

Service content and coordination matters

The service includes status verification, scheme design, equipment manufacturing, on-site construction and commissioning review, which can be entrusted in stages according to the needs of the enterprise. What the enterprise needs to cooperate with is to provide operation records and process data, arrange personnel to accompany the verification, and arrange the construction window according to the agreement.

FAQ

Do you need to stop production during the renovation?

Depending on the scope of the transformation. Most of the parameter adjustment and segmental supplement can be completed in the maintenance window. If the main equipment is involved in the replacement, a certain shutdown time needs to be arranged, and the implementation window will be considered in the scheme stage.

How to judge the renovation or the new?

It mainly depends on how much usable value is left in the existing equipment. If the main structure, foundation and site can be used, the transformation is usually more economical; if the original design deviation is large and the site is limited, the new construction may be clearer. The verification phase will compare the inputs and cycles of the two routes.

After the transformation can guarantee to achieve the desired effect?

In the scheme stage, the transformation target and configuration will be determined according to the verified working conditions, and in the debugging stage, the target will be verified item by item. The actual effect is related to operation management and working condition stability, so debugging and operation record are equally important.

This article is organized by Luoyang wohong petrochemical equipment co., ltd. the company provides design, manufacturing and operation and maintenance services for condensation recovery, membrane separation recovery and complete solvent recovery units for chemical and pharmaceutical enterprises. if you need process evaluation or scheme configuration, please contact and exchange.

National Service Network

NATIONAL SERVICE NETWORK 31 Provinces and Municipalities - Local Service
Online Service
Hotline

Hotline

13526990215

WeChat
Luoyang Wohong Petrochemical Equipment Co., Ltd.
Back to Top