Service Hotline:

13526990215

Luoyang Wohong Petrochemical Equipment Co., Ltd.

Luoyang Wo Hong Petrochemical Equipment: Introduction to Managed Operation and Resident Operation and Maintenance Services of Recovery Unit

Release date: 2026-10-01 05:49:22 popularity:

There are three modes of solvent recovery unit management: enterprise self-management, repair-by-time service, and managed operation. For enterprises with large-scale devices, rigid emission requirements, or insufficient own staff, hosting operation is a common choice-the service provider sends people to station or tour to take over the daily operation, parameter adjustment, maintenance and record management of the device, and the enterprise evaluates the operation results according to the agreement. The core of hosting is to turn the equipment in good condition into operation standard: the equipment is not bad does not mean that it is running well. The indicators of hosting assessment are emission, recovery rate and energy consumption, not several times of equipment repair.

There is no conflict between hosting and maintenance services: the service provider is responsible for daily maintenance within the hosting scope, and major repairs and technical improvements are organized separately as planned; for other equipment outside the hosting scope, the service provider can provide support on demand. The boundary is clearly written in the agreement, and the assessment and responsibility have the basis.

Managed what

The content of the trusteeship is covered by the whole operation process: daily operation and patrol inspection are carried out according to the operation procedures, parameter adjustment is carried out according to the change of working conditions, the first time disposal of alarms and abnormalities is completed by the on-site personnel, maintenance is scheduled according to the plan, and operation records and ledgers are established according to the specifications. The staffing is determined according to the scale of the device: a single device is mainly based on itinerant operation and maintenance, multiple devices or continuous production occasions are on duty, and the arrangement of white night shift is determined according to the production rhythm. The qualification and training of field personnel shall be the responsibility of the service provider, and the assessment shall be jointly conducted by both parties according to the indicators.

The transparency of hosting depends on records and data: daily records of operating parameters, processing capacity, energy consumption, exception handling, monthly operation report delivery, enterprises can check data and look at the scene at any time-hosting is not handed over and ignored, but the interface between management and management is clearer.

How to determine the assessment

Luoyang Wo Hong Petrochemical Equipment: Introduction to Managed Operation and Resident Operation and Maintenance Services of Recovery Unit

The assessment index is set according to the functional orientation of the device: the emission index is the first, and the standard and stability are the bottom line; The recovery rate reflects the economy of the device and is determined according to the design value or the standard value. Energy consumption is calculated according to the unit recovery amount and compared with the baseline. Equipment intact rate and response time are used as process indicators. The target value of the indicator is stated item by item in the escrow agreement, scored monthly by data, and the assessment results are linked to the service cost-the operation results are turned into quantifiable accounts, and the responsibilities and rights of the escrow can be straightened out.

The first one to three months of the escrow is the transition period, when the service provider finds out the status of the device, complements the records and the base number of spare parts, and the enterprise checks the caliber of the indicators. At the end of the transition period, both parties shall confirm the baseline, and the assessment shall be officially started. The status before the starting point shall not be included in the assessment scope.

Service Content and Delivery

Service ModuleContentAssessment method
Daily operationsOperation inspection and parameter adjustmentSampling of process records
MaintenancePlan Scheduled ExecutionEquipment intact rate index
Exception Handlingalarm first time processingResponse aging record
Data ManagementRecord ledgers and reportsMonthly Report Quality
Indicator assessmentEmission recovery and energy consumptionMonthly scoring linked to expenses
Transitional handoverBaseline establishmentAfter confirmation by both parties

How does the service land

  1. The scope and boundary of trusteeship shall be written, and the equipment list shall be confirmed one by one;
  2. The operation and maintenance records cover the whole process;
  3. The assessment indicators are mainly based on three items of emission recovery energy consumption;
  4. Monthly operation report delivery, data available at any time;
  5. The transition period is one to three months, starting from the confirmation of the baseline;
  6. Overhaul and technical renovation shall be organized separately according to the plan, and the expenses shall be listed separately.

FAQ

Which is the best deal, hosting or hiring someone to run it yourself?

Calculate two accounts: labor costs and operating results. Professional ability, spare parts channels and experience accumulation is the advantage of hosting, small device self-management is more flexible, medium-sized or rigid device hosting most of the advantages, according to their own size and requirements.

How to arrange the original operation team?

It can be transformed into a supervision and cooperation position: the enterprise retains the function of operation supervision and assessment, and the service party is responsible for the specific operation. The placement of personnel is decided by the enterprise, and the coordination interface is stated in the agreement, and the responsibilities of both sides do not overlap.

Who is responsible for post-escrow device modification?

Overhaul and technical reform separate plan: the service side put forward suggestions and plans, the enterprise decision investment, the implementation can be undertaken by the service side or can be organized separately. The cost of renovation is accounted for separately from the cost of hosting, and the accounts are clear.

This article by LuoyangWohong PetrochemicalEquipment Co., Ltd. arranges that the company provides design, manufacturing and operation and maintenance services for condensation recovery, membrane separation recovery and complete solvent recovery devices for chemical and pharmaceutical enterprises. If you need process evaluation or scheme configuration, please contact and exchange.

National Service Network

NATIONAL SERVICE NETWORK 31 Provinces and Municipalities - Local Service
Online Service
Hotline

Hotline

13526990215

WeChat
Luoyang Wohong Petrochemical Equipment Co., Ltd.
Back to Top