Luoyang Wohong VOCs exhaust gas recovery device, with quick installation design and installation

VOCs exhaust recovery projects, equipment installation cycle is often a key factor affecting the progress of the production line. Traditional equipment requires on-site construction, pipeline welding and instrument debugging, with a construction period ranging from weeks to months. Luoyang Wohong's skid-mounted design integrates the compressor, condenser, membrane module and control system on a steel base. The assembly and debugging are completed before leaving the factory. The site can be operated only by switching on the power supply and gas circuit. The installation period is calculated in days.

The advantages of the skid-mounted design are not only fast installation. The equipment covers an area of small, conventional unit size between a few meters to ten meters, can be placed in the open air, do not need to build a separate plant. If relocation is required in the later period, the whole hoisting can be used, and the equipment can be reused, thus avoiding the asset precipitation problem of fixed equipment.

The equipment uses a compression condensing membrane separation process, driven by electricity, does not require natural gas, noactivated charcoalConsumables do not generate hazardous waste. The system is equipped with PLC automatic control, automatic start and stop according to the situation of exhaust gas, no special person on duty. Mainly suitable for high concentration, recovery value of VOCs waste gas, such as chemical storage tank breathing gas, pharmaceutical solvent exhaust, printing coating exhaust gas and other scenarios.

Luoyang Wo Hong can match the equipment specifications according to the exhaust gas parameters provided by customers, and the air volume ranges from tens to thousands of cubic meters per hour. It is recommended to complete the exhaust gas test before selection, confirm the concentration, composition and air volume, and then determine the specific configuration scheme. The skid-mounted unit is put into operation quickly after being in place on site, which is suitable for projects with tight construction period or limited site.


National Service Network

NATIONAL SERVICE NETWORK 31 Provinces and Municipalities - Local Service
Online Service
Hotline

Hotline

13526990215

WeChat
Luoyang Wohong Petrochemical Equipment Co., Ltd.
Back to Top