Many companies have a misunderstanding that as long as they spend money to buy a set of VOCsWaste gas treatment equipmentInstall, EIA acceptance will certainly pass. The reality is not like that. There are many cases where the equipment is installed but cannot pass the EIA. What are the reasons?

The core of EIA acceptance is that the concentration and rate of treated exhaust emissions must meet national and local standards, and removal efficiency, unorganized emission control and equipment operation records must also be examined. If the equipment selection does not match the exhaust gas characteristics, such as.activated charcoalAdsorption treatment of high concentration, high humidity exhaust gas, will soon be saturated failure, emission data naturally not up to standard. If the design air volume of the equipment is insufficient, resulting in some exhaust gas escaping from the bypass, it will not pass the acceptance. In addition, there are clear requirements for the treatment process in the EIA documents, and unauthorized changes to the process may also lead to acceptance failure.

Therefore, before installing the equipment, the process design must be based on the precise exhaust gas conditions. A highly reliable process route is the condensation and membrane separation process. The process converts most of the organic matter from the gas phase to the liquid phase through the condensation unit, realizes direct recovery, and then further purifies the tail gas through the membrane separation unit. Since the whole process is physically separated, it does not involve high-temperature combustion or chemical conversion, the operating state is stable, and the emission data is highly predictable. LuoyangWohong PetrochemicalWhen designing the condensation and film method system for customers, Equipment Co., Ltd. will first make a detailed analysis of the exhaust gas components to ensure that the equipment can stably meet the emission limits required by the EIA after it is put into operation.

To ensure that the EIA is passed, the enterprise should require the technical party to provide successful cases of the same industry and the same working conditions, and agree on the terms of acceptance of emission standards in the contract. The installation of the equipment is only the first step. Continuous and stable operation and data compliance are the real guarantee for passing the EIA.


National Service Network

NATIONAL SERVICE NETWORK 31 Provinces and Municipalities - Local Service
Online Service
Hotline

Hotline

13526990215

WeChat
Luoyang Wohong Petrochemical Equipment Co., Ltd.
Back to Top